Like most audio/video (AV) integrators, we have been quite busy this summer. My company is taking on more projects than ever before, and I explained to my Engineering team that this is analogous to eating a big Thanksgiving dinner: the more food you eat in a given meal, the more likely your stomach will be in pain as you process all of that food.
Let’s flesh out this analogy: the more we eat (Sales), the more likely our stomach (Engineering and CAD) will hurt, and it is difficult to speed up that process . The only thing we can do to increase our overall metabolism (or so called ‘bandwidth’) is to try and exercise more often; exercise = training. And just like exercising, integration engineers need to make/find the time for training, to keep the process moving at a good pace.
If your Sales department is the mouth of the process, and Engineering/CAD is the stomach, then the next step is the process is Purchasing, which would be the small intestine. Some products have long lead times, others may be more readily available, and will move more quickly through the intestines, like liquids. The point is, the purchasing and receiving process usually takes a while, and largely depends on the Engineering to have things ready to go. If the stomach stops working, then nothing gets to the intestines.
According the Wikipedia, “[the] large intestine, also known as the large bowel or colon, is the last part of the gastrointestinal tract and of the digestive system in vertebrates. Water is absorbed here and the remaining waste material is stored as feces before being removed by defecation”. In our AV project analogy, the large intestine represents the rack building and programming of the DSP (digital signal processor) and/or control systems. The rectum represents the testing that happens before the installation begins.
At this point in the analogy, I need to be very careful to not offend anyone. To put it simply, the field installation teams are by far the most important part of the process, because without them, the rest of the process would get backed up. The project managers and installers don’t determine what projects we take on (eat), and yet they are the ones that inevitably have to deal with the … well, you get me. When they are finished, the integration process is essentially done. If Sales goes after junk-food-type projects, or if the Engineering and Purchasing departments make mistakes, you can expect some flatulence. Although it may be too late to fix the current project, the rest of the body will learn to take on jobs that are more healthy, and cause less pain.
So, are we finished here? Not yet! Assuming the system has been fully tested, the client needs to be trained, and the as-built drawings and manuals need to be delivered. Skipping this part of the process would be analogous to not using any toilet paper. You need to clean up! Some audiovisual integration companies are very faster than others in completing this step, others may take longer because they are more thorough. But no matter how long it takes, don’t skip this step! If you do, your clients will likely think that you stink. :)